The ReArch Construction crew is making great progress on both the interior and exterior of the new Upper Campus Commons. Here are some of the latest images from Senior Superintendent Joe Lattuca.

Overhead view of interior showing concrete floors and steel framework
Side view of exterior with window frames and plywood
Interior of construction showing wall framing and concrete slab floor
interior with sunlight coming through white building wrap of large windows
building exterior with window cutouts and yellow sheathing