February 23, 2026

UCC progress - week of February 16

With the impending Nor'easter, the ReArch Construction team focused on tightening up the building. Progress was also made with installation of conduits and fine grading in preparation for slabs. The framing for windows between Stone Hall and the Upper Campus Commons is also taking shape! 

Photos courtesy of Joe Lattuca, senior superintendent for ReArch Construction.

several long pieces of conduit piping with a construction worker laying it into dirt floor
Conduit installation
overhead view of construction space with a machine roller smoothing out the dirt
Fine grading
construction worker on roof of building with many segments of piping for roof drainage
Temporary roof drainage installation in preparation for snowstorm
Two constructions workers near ladder in front of large window frame looking into large open space
Windowhead framing looking into great room.